| History |
| |
Getik, formerly Nor Bashgyugh (New chief village), was founded in 1922, by several families from Artsvashen (now seized by Azerbaijan). It is located 12 km north-west from Chambarak (former Krasnoselsk) on the east bank of Getik River.
|
| |
| |
| Projects |
| |
Completed
ASIF-school rehabilitation, 2002.
School building program in Gegarkunik marz, Getik secondary school in 2002
Ongoing
MoA, WB RESCADP-road, irrigation, drinking water, electricity, gas
UMCOR-Pharmaceutical Distribution project
MCA road rehabilitation program /Antaramej-Dzoravank (3 km, C)-Dprabak (2 km, C)-Aygut (3 km, C)-Martuni (9 km, C)-Getik (1 km, C)-Ttujur (3 km, C)-Chambarak (4 km, C)-Aghberk (10 km, C)-M14 (2 km, B)/
|
| |
| |
| General Information |
| |
| Distance from Yerevan |
140 km |
| Distance from Marz Center |
115 km |
| Distance from border |
2 km |
|
|
| Altitude above sea level |
1,820 meter |
| Climate |
Dry continental |
| |
|
| Historical monuments |
khachkars, Mughani Khach, cyclopean fort (iron age) |
|
|
| Population: |
530 |
| Households |
157 |
|
|
| Total area |
1700 hectares |
| Of which: |
|
| Pastures |
0 hectares |
| Arable land |
0 hectares |
| Orchards |
0 hectares |
| Forests |
0 hectares |
|
|
| Land use |
|
|
| |
| |
| PROGRAM COMPONENTS |
| |
| Infrastructure Assessment |
| |
There is no irrigation system.
The agricultural machinery used in the community is obsolete. |
| |
| |
| Infrastructure priorities for the rural community of Getik |
| |
| Infrastructure |
Priorities |
Total amount needed (AMD) |
Funding sources |
| Road |
Rehabilitate 4 km road leading to the village from Ttujur, and 3 km intracommunity roads. Pavement of 10 km of field roads needed. |
|
Ministry of Agriculture of Republic of Armenia,World Bank Rural Enterprise and Small-scale Commercial Agriculture Development Project Millennium Challenge Armenia road rehabilitation program /Antaramej-Dzoravank (3 km, C)-Dprabak (2 km, C)-Aygut (3 km, C)-Martuni (9 km, C)-Getik (1 km, C)-Ttujur (3 km, C)-Chambarak (4 km, C)-Aghberk (10 km, C)-M14 (2 km, B)/ |
| Irrigation |
The internal network is non-functional, however it is possible to construct a 2 km gravity irrigation pipeline and/or pumped pipeline from Getik River. |
|
Ministry of Agriculture of Republic of Armenia,World Bank Rural Enterprise and Small-scale Commercial Agriculture Development Project |
| Drinking water |
Completely obsolete network not repaired since 1940s. |
|
Ministry of Agriculture of Republic of Armenia,World Bank Rural Enterprise and Small-scale Commercial Agriculture Development Project |
| Electricity |
|
|
Ministry of Agriculture of Republic of Armenia,World Bank Rural Enterprise and Small-scale Commercial Agriculture Development Project |
| Gas |
|
|
Ministry of Agriculture of Republic of Armenia,World Bank Rural Enterprise and Small-scale Commercial Agriculture Development Project |
Kindergarten
School |
School has been renovated, but gym needs repair. |
|
|
| Health Care |
|
|
United Methodist Committee on Relief-Pharmaceutical Distribution project |
| Telephone: Cell / Land |
Local subscribers are connected to an obsolete analogue exchange, the quality of service is very bad both within the community and outside of it. |
|
|
| Internet |
|
|
|
| TV, radio |
The national TV channels are weak; some villagers have been provided satellite access. |
|
|
| Community / Cultural Center |
It needs major repair and furnishing. |
|
|
| Lighting and Landscaping |
|
|
|
| Other |
|
|
|
| Other |
|
|
|
| Other |
|
|
|
| Other |
|
|
|
| TOTAL NEEDED |
|
| |
| |
| Economic Assessment |
| |
Remoteness and/or inaccessibility of the main markets from Getik is a serious constraint.
The community has 1,700 ha total area, of which 800 ha are pastures, 700 ha are grasslands, and 220 ha are arable lands; therefore animal husbandry is worth supporting. Although the current number of cattle in Getik is not small (about 600) only a few farmers keep a commercially profitable number of cattle: more than 25. This sector can be developed via improvement of breeds, better feeding and ultimately increase of milk and meat commercialization level.
Cheaper and regular irrigation would make possible production of rich feed. This activity will allow not only the increase of milk productivity but also livestock breeding.
The local climatic conditions are also favorable for intensively raising sheep (the number of sheep in Getik is only 500) which will include production of meat, sheep's milk and wool.
Getik has a fairly developed apiculture; every year they produce more than 10 tons of honey.
The commercial profitability can increase with a larger beehive/farmer ratio.
Microfinancing is necessary for growth in all sectors.
|
| |
| |
| Images from Getik |
| |
|