| History |
| |
|
The community of Ranchpar was established in 1929. It was composed of Azeri and Yezidi population. In 1988-1989, the Azeri population left Armenia and moved to the Republic of Azerbaijan and Armenians evicted from Azerbaijan immigrated to Ranchpar. At the present there are 361 farms, with about 10% belonging to Yezidis.
The Ranchpar community borders Turkey. It is located on the east bank of the Araks River, at a distance of 500 meters from the water’s edge. |
| |
| Projects |
| |
|
| |
| |
| General Information |
| |
| Distance from Yerevan |
30 km |
| Distance from Marz Center |
29 km |
| Distance from border |
0 km |
|
|
| Altitude above sea level |
830 meter |
| Climate |
Dry continental |
| |
|
| Historical monuments |
none |
|
|
| Population: |
1,361 |
| Households |
340 |
|
|
| Total area |
1,169 hectares |
| Of which: |
|
| Pastures |
204 hectares |
| Arable land |
264 hectares |
| Orchards |
40 hectares |
| Forests |
0 hectares |
|
|
| Land use |
farming, animal husbandry |
|
| |
| |
| PROGRAM COMPONENTS |
| |
| Infrastructure Assessment |
| |
|
Renovation of roads.
Restoration of irrigation and drinking water system.
Pipeline construction for natural gas.
School heating system restoration.
Renovation of community and cultural centers. |
| |
| Infrastructure priorities for the rural community of Ranchpar |
| |
| Infrastructure |
Priorities |
Total amount needed (AMD) |
Funding sources |
| Road |
10 km repair |
227,000,000 |
|
| Irrigation |
restoration |
8,000,000 |
|
| Drinking water |
|
|
|
| Electricity |
|
|
|
| Gas |
Pipe-line construction |
46,000,000 |
|
Kindergarten
School |
Heating, furnish |
12,000,000 |
|
| Health Care |
|
|
|
| Telephone: Cell / Land |
|
|
|
| Internet |
|
|
|
| TV, radio |
|
|
|
| Cultural Center |
Construct |
45,000,000 |
|
| Community Center |
Renovate and furnish |
10,000,000 |
|
| Other |
|
|
|
| Other |
|
|
|
| Other |
|
|
|
| Other |
|
|
|
| TOTAL NEEDED 348,000,000 AMD |
|
| |
| |
| Economic Assessment |
| |
|