| CLUSTERS:"Lori Cluster" |
| Schools |
General Information: Most schools in the Lori cluster villages are the remnants of Soviet times and no longer correspond to the modern learning standards. Most schools are in dire condition and in much need of comprehensive renovation works to offer the children of the region the best possible learning facilities. Artsni Primary renovations: The whole structure is in unsatisfactory condition. The roof, the walls and the floors of the school all need to be repaired along with replacing the windows, doors, the electric wiring and installation of a heating system. The school premises need to be improved, along with the modification and modernization of the exterior. The school also needs new sanitary units. Area to be repaired: It is not viable to reconstruct the whole area of the school but instead focus on rebuilding around 1500 m2, which would meet all the requirements of an educational process. Number of employees in the school: Currently 21 people work in the school from which 14 are teachers and the rest is the administrative staff.
Apaven Number of kids in school: There are 9 students in the village who attend school in Artsni. Dzoramut Primary renovations: The proposed restoration plan is also similar and comprises of rebuilding around 1500m2 of the building, which will include the classrooms and all the necessary facilities. Area to be repaired: Under the proposed project, 1500 m2 should be reconstructed. Number of kids in school: Currently, there are 84 students in the school. Number of employees in the school: Currently 26 people work in the school from which 17 are teachers and the rest is the administrative staff. Dzyunashogh Primary renovations: The school is in poor condition and needs renovation. Reparation is needed on the floors, doors and windows as well as the roof of the school. The school building also needs heating system and installation of sanitary units. Area to be repaired: Under the proposed project, 1360 m2 should be renovated. Number of kids in school: Currently, there are 49 students in the school. Number of employees in the school: Currently 22 people work in the school from which 14 are teachers and the rest is the administrative staff. Gogavan Primary renovations: A new 250 m2 school building needs to be built to accommodate the needs of the community. Area to be repaired: Under the proposed project, 250 m2 school building needs to be built. Number of kids in school: There are 7 students in the school. Number of employees in the school: Currently 4 people work in the school from which 3 are teachers and the rest is the administrative staff.
Paghaghbyur Primary renovations: Whole building of the school needs renovation. The roof, walls and floor of the building are in very bad condition, windows and doors also should be renovated. The school building needs heating and sanitation systems. Number of kids in school: Currently, there are 24 students in the school. Number of employees in the school: Currently 7 people work in the school from which 4 are teachers and the rest is the administrative staff.
|