General Information: All the health care points in the Lori cluster are being supplied by the Health Care Ministry of the Republic of Armenia. Considering that the cluster villages are located very close to each other, it is practical to have one fully restored and reequipped modern ambulatory in the cluster center. It would come complete with an ambulance car and would serve the needs of all the villages in the cluster. At the same time, the Program will also concentrate on training the personnel of all the health care points in the cluster.
Artsni
Current situation : The health care point is located in the first floor of the two story building which was built in 1962. The second floor is the administration office area. The building needs repair.
Dzoramut
Current situation : The health care point building was built in the 60s and is a stone two story building with the capacity of accommodating the health care point, the community administration and the community center.
Primary renovations : The building needs major reconstruction and planning modifications. The floors need to be replaced. The first story walls have been damaged by moisture and need to be water isolated. The roof of the building needs to be changed along with the doors and windows. The walls and the ceilings also need to undergo renovation. New sanitary units need to be installed along with a heating system for which a boiler room has to be built.
Area to be repaired : Under the proposed project, 1680 m² building needs to be reconstructed. |